Skip to main content

GREY-INTO-GREEN

I. SUMMARY INFORMATION
Project
303076
Status
Submitted
Award category
Reconnecting with nature
You want to submit
NEW EUROPEAN BAUHAUS AWARDS: existing completed examples
Project title
GREY-INTO-GREEN
Full project title
RE-NATURING AN INDUSTRIAL PARK: CO-GREENING A MOTORWAY MAINTENANCE STATION
Description

The interdisciplinary renaturation project goals a comprehensive greening of an industrial building complex. In the course of an inclusive cooperative planning process. The participating employees, researchers from the company's green space management (Austrian Motorways) were equipped with different user interests and ecological concerns.The site is an existing of an industrial building complex, situated around a courtyard, consisting of a remarkable office building, workshops and garages.

 

What was the geographical scope of your project?
Regional
Vienna
Does your project address mainly urban or rural issues?
Mainly urban
Does your project refer to a physical transformation of the built environment or other types of transformations?
It refers to a physical transformation of the built environment ('hard investment')
Has your project benefited from EU programmes or funds?
No
Has your project won an EU prize?
No
Your project is fully completed?
Yes
When was your project implemented?
How did you hear about the New European Bauhaus Prizes ?
Newsletter
On whose behalf are you submitting the application?
As an individual
II. DESCRIPTION OF THE PROJECT
Please provide a summary of your project

The project 'Grüne Autobahnmeisterei' aimed at renaturing, regenerating and ecologising an industrial complex: making the open spaces usable, cooling down against summer heat, reducing cooling energy consumption and employee friendliness were the main objectives of the project.

Restructuring for accessibility of the open outdoor spaces for employees and visitors in a cooperative planning process, the employees working directly at this site worked together with the experts from the company for green space management for microclimate-friendly planning and participation. The submitters of this contribution (expertise in urban research, B. Bretschneider) has steered and managed the co-planning process in communication with horticulturist and construction componies, botanist. Auch die Kostenverfolgung for eine affordable Umsetzung war her responsibilty.

Planning of adjesent spaces that bring individuals and communities closer to nature, that contribute to regenerate natural ecosystems and prevent loss of biodiversity or invite them to reconsider their relationship with nature in a life centred perspective has been a long but efficient process with learning effect.

The site place, the areal of 'Autobahnmeisterei Inzersdorf' in Vienna is in summer days an significant hotspot.
The industrial complex ist consisting of office building with reinforced concrete facades, in still of 1970s and workshops. It is situated between two busy city motorways, forming a courtyard complex . Between the surrounding buildings, in the middle, there is courtyard with an oversized asphalt surface that served as a traffic area for work machines, trucks and employees. The surrounding area is shown in infrared satellite images to be one of the hottest areas in Vienna. In addition, the surfaces of the motorways pose a flood risk for the industrial area, which itself has little possibility of water percolation due to the continuously sealed surfaces. 

 

Please indicate the main themes of your project with 5 key words
Renaturing/Greening
Participation / Inclusion of users
Sustainability / Climate mitigation
Biodiversity / Wild Life
Affordability - Transferability
Please give information about the key objectives of your project in terms of sustainability (including circularity) and how these have been met.
Please highlight how the project can be exemplary in this context
  • Microclimate and ecological improvement: Improvement of microclimatic conditions in the industrial complex and its surroundings

Improvement of indoor air quality for the employees using the offices and workshops of the ABM complex, reduction of emissions and noise pollution from the busy motorway running from both sides.
(Noise pollution and other traffic emissions).

  • Reduction of cooling energy consumption : Reduction of cooling energy consumption through unsealing (removal of asphalt surfaces) to green the surrounding areas using the natural shading provided by trees and vertical greening.

  • Reducing the phenomenon of the urban heat island in the hot summer months by using the evaporative cooling of green plants and by protecting against global radiation.

  • Regulation of rainwater through removing the asphalt and beton surfaces and stone garden, to create green areas around the buildings.

  • Mitigating the effects of extreme weather conditions by cooling down and less usage of cooling sythem in hot periods

  • Infiltration of rainwater, relieving the burden on sewage systems and reducing the risk of flooding during extreme weather conditions

  • Promoting biodiversity

  • Enhancing biodiversity through the selection of endemic plants (interactions between birds, insects and plants)

  • Experimenting with plant species that are resistant to climate change. (Resistant to drought and extreme weather conditions

  • Low-tech and low-cost implementation, also by coperative implementation and production of greening

  • Affordable implementation of greening measures through low-tech and low-cost methods for constructional systems of the greening measure (specal
  • Edible garden for employees: fruit orchard behind the workshop buildings  and a mini-vineyard along the wooden construction in front of the office building as well as edible shrubs with dozens of berry species (Zone 2 in the illustration attached)

 

 

Please give information about the key objectives of your project in terms of aesthetics and quality of experience beyond functionality and how these have been met.
Please highlight how the project can be exemplary in this context

At the beginning of the project, the team of the company wanted a high tech green wall system at the cantilivering  facade of the office building as the only greening measure. The aesthetics of high tech green wall Systems are currently popular in the architectural world as well known. Our cost analyses showed that it would be a cost-increasing, but less ecologically and microclimatically effective solution. 

Afterwards, it was jointly decided to create the most effective greening possible in terms of ecology, climate protection and aesthetics, especially in the entrance area. Solutions with low maintenance requirements and low costs were to be used. 

With the same budget of a green wall system, around 35 trees, 1500 perennials, 160 hedge trees and a natural meadow could be planted. The large unsealed area in front of the office building allowed for a natural aesthetic to the entrance area with different plant species. The climbing plants on the cantilevered upper storey have a custom-designed and extremely low-cost climbing plant construction.

All the greening measurements are aesthetically in harmony with the building of a significant architecture. It is also accentuate and modernise the  building of 70's by providing a frame of greenery. This effect will only become apparent within a year, because the plants still have to thrive. 

 

Please give information about the key objectives of your project in terms of inclusion (equal opportunities, public participation, citizen engagement, co-design, universal design, accessibility, affordability, etc.) and how these have been met.
Please highlight how the project can be exemplary in this context

Inclusive Planning: participative co-design

Involvement as well as active participation of the local company's staff and workers with diversed expertise and responsibilities in the implementation and realisation:
In some cases, very different focal points and functional interests formed a cohesive process of decision-making and planning, consisting of workshops and interim discussions. The objectives and ways of implementation were then concretised and put into practice.
All in all, the following disciplines and sectors were involved: Planners and consultants from the fields of landscape planning, biology, cultural engineering, as well as architecture, forestry, civil engineering, gardening and landscaping companies, and companies involved in the maintenance of open spaces.

All these planners and consultants as well as users (member of the ABM team) contributed ideas, wishes and framework conditions in consensus. In particular, the choice of plants and their placement was a challenge, because the company's policy provided for high restrictions (with a list of undesirable neophytes).

Involvement of staff and experts of sustainability and green space management of the company, in decision-making and utilisation concept development.
Participation of users of the areal, the members of staff, both in care and in maintenance:
The participation processes and involving of individuals' and users' wishes increase willingsness for a cooperation, also for the future. 
Some of the constructional work on the site such as unsealing the asphalt surfaces and removal of stone garden (gravel) to make place for green areas, as well as the new extensions for the existing wooden panels in front of the office building and adapting them (with rank aid) for the climbing plants has

Please explain how these three dimensions have been combined in your project.
Please highlight how this approach can be exemplary

It was the first process of involving users and experts from the company together with an external researcher and planner.  The fields of expertise has been very diversed: Architecture, construction, landscape design, gardeners, reearch of climate and botanical science, building management, etc. 

Low cost design and very easy garden maintenance in future by involving staff are the aspects, which are exemplary.

 

It should be testet, how affective the cooling and calming impact are achieved. 

Please give information on the results/impacts achieved by your project in relation to the category you apply for

We gained the following knowledges and experiences as project team:

According to international research work, which plants and trees are still resistant to climate change. 

What are the methods and steps of  co-planning in greening projects  similar cases, especially in the urban areas as problem zones?+

How can managed the difficulties in interdisciplinary collobaration?

The Motorways Austira (Asfinag) has dozens of similar maintenance and service stations protecting the green corridors of motorways and carrying the construction of the motorways.

Surprisingly, the  protection of species and wild life  is a big corporate issue.  But this kind of greening for a building complex has not been not practiced. 

Please explain how citizens and civil society were involved in the in the design and/or implementation of the project.
Please also explain the benefits that derived from their involvement.

The employees, guest are the main users of the upgradet area. (Around 100 people, working all day or partly there)

Improvements in the climate will be noticeable in larger surroundings. In addition, the layout of highways is visible.

It will be an good example for every passing car driver and every visitor of neighbouring shopping area, which is used mostly by low income groups, with less acces to green areas.

Please explain what kind of global challenges the project addressed by providing local solutions

The choise of plants can be varable, according to climate conditions of the regions. 

Please highlight the innovative character of the project as compared to mainstream practices in the field of the project.

Innovativ by the method, the way of participation and involving research data. 

Please explain to the potential of transferring the projects’ results or learnings to other interested parties and contexts.
Please provide clear documentation, communication of methodology and principles in this context.

There are a huge series of similar site places of Asfinag and other companies. 

The method and greening measeres are transferable everywhere.

 

Is an evaluation report or any relevant documentation available?
No
If you would like to upload additional documentation, please upload it or write it below
III. UPLOAD PICTURES
IV. VALIDATION
By ticking this box, you declare that you are not in in one or more of the exclusion situations foreseen under Article 136 of the Financial Regulation.
Yes
By ticking this box, you declare that all the information provided in this form is factually correct, that you assume sole liability in the event of a claim relating to the activities carried out in the framework of the contest, that the proposed project has not been proposed for the New European Bauhaus Prizes 2022 in any other category or strand and that it has not been subject to any type of investigation, which could lead to a financial correction because of irregularities or fraud.
Yes
By submitting your application, you guarantee that you are the author or have the rights to proceed with the application and to authorise the use of the project, concept, idea, and that you have obtained any necessary consents, licenses or assignments from third parties and included copyright notices when necessary.
Yes
By submitting your application, you understand that all the applications that meet the eligibility requirements will be shared for the purposes of the selection processes, and notably published on the secured platform https://prizes.new-european-bauhaus.eu/ and for the purposes of the promotion of these on the New European Bauhaus website and/or other European Commission communication channels. In this sense, the applications would be widely available. Applicants should ensure that they present their ideas, concepts, projects, in such a way that they could be shared without giving rise to intellectual property related concerns. If your submission is selected as one of the finalists, it will additionally be shared for the purpose of the public vote that will take place. The European Union is granted a licence to use and share your application with the general public and the official external experts for the purposes of the selection process, including the voting. The European Union has the right to use the images and visual materials and the description provided in the application for communication purposes related to the contest and beyond. Rights granted comprise the right to store, reproduce, display, publish and communicate or distribute copies in electronic or digital format, including, but not only, through the internet. Unless you have disclosed your name, the European Commission has no obligation to share your name when using or disseminating your contribution to the public. The European Union cannot be held responsible in case any submitted idea, project, concept is found to infringe third parties rights. The European Union shall be neither responsible for the use that third parties may do of the applications or related content.
Yes

Attention

In order to submit your project, please make sure you have filled in all the mandatory fields marked with *, in both the “Basic information” and “Description of the project” tabs.

Attention

The country you have selected is not a Member State of the EU.

Please select the country your project was either implemented in the EU for strand A in or is being developed or intended to be implemented in the EU for strand B.