Skip to main content

Beatmatching

I. SUMMARY INFORMATION
Project
303446
Status
Submitted
Award category
Shaping a circular industrial ecosystem and supporting life-cycle thinking
You want to submit
NEW EUROPEAN BAUHAUS RISING STARS: concepts or ideas submitted by young talents (aged 30 or less)
Project title
Beatmatching
Full concept/idea title
Description

As an entry point to Pont-Aven, Belle Angèle is an industrial wasteland located between rurality, urbanity and river : a convergence point of living temporalities. Grounded on their mutual synchronizations, our project advocates a new way of inhabiting its territory by balancing humans’ rhythms and natural cycles. Tools for this territorial mutation include revitalization and reemployment of the existing infrastructure. "Beatmatching” aims to orchestrate times, rhythm and cycles.

What is the geographical scope of your concept/idea?
Local
Pont-Aven
Bretagne (Brittany)
Does your concept/idea address mainly urban or rural issues?
It addresses urban-rural linkages
Does your concept/idea refer to a physical transformation of the built environment or other types of transformations?
It refers to a physical transformation of the built environment ('hard investment')
Has your concept/idea benefited from EU programmes and/or funds?
No
Has your concept/idea won an EU prize?
No
How did you hear about the New European Bauhaus Prizes ?
Other
On whose behalf are you submitting the application?
As an individual in partnership with other persons
II. DESCRIPTION OF THE PROJECT
Please provide a summary of your concept/ idea

Our project is developed on the site of the Belle Angèle in Pont-Aven, in Brittany, on an industrial wasteland of a former cannery. 


We propose to consider time as a material for tomorrow's urbanism: the project proposes to revive this industrial wasteland by synchronizing human and non-human rhythms, and natural cycles (water, soil, climate...) both in the spatial and temporal development of architectures and public spaces. 
From the potentials of the wasteland site and the Aven watershed, we imagine situated tools, put at the service of the activation, programming, fabrication and collective construction of a common project. It is a question of composing with the Pont-Aven's inhabitants, at the threshold of their city, a district-workshop to test and adopt a temporality and a more organic urban space founded on the decompartmentalization, the mutualization, the modularity and the reversibility of the places and the uses. Then, if it works, to spread them on the whole territory of Aven. We propose here a first collection of the resources, temporal or material, which the territory has, an adapted toolbox, leading to the illustration of a possibility, among others, of development of the site in space and in time. Without imposing a locked program, a strict division or a precise phasing, we wish to sketch out tracks, to awaken curiosity, and to give the desire, to collectively "remix" the Belle Angèle.

Please indicate the main themes of your concept/idea with 5 key words
synchronization
cycles
rythms
resources
toolbox
Please give information about the key objectives of your concept/idea in terms of environmental sustainability (including circularity) and how these would be met.
Please highlight how the concept/idea can be exemplary in this context

The pandemic has created a sudden pause in our urban lives. So far governed by the frenetic tempo of a lifestyle based on clocks rather than on natural life cycle, sun and seasons. When this humming suddenly stopped, we took measure of time. The linearity of the day and compartmentalization of activities and places dissipated for a moment to offer short rest to all living organisms. Thanks to a spring season spent inside, some people could afford the time to observe the transformation of vegetation in the countryside. They could listen to the birds singing in the city and dream of a life at this pace. Unfortunately, once the wave had passed, everything started to move again. The pace of our lives speeded up once more. However, we became aware that time, rhythms and cycles are important parameters when thinking about urban planning. Time is short: climate change requires us to change how we conceive cities and how we live in them. It requires us to pay attention to the rhythms of each individual, especially those for whom time is a luxury.

Environmental sustainability issues are addressed in a transversal way, on various themes:

  • Materials :

Reuse, recycle materials on site (metal trusses, asphalt...)
Create and experiment with new materials from waste (molds, etc.)
Use local materials, from virtuous channels (wood, ...)

  • Biodiversity :

Create a plant nursery on site at the beginning of the project which will then be used on the rest of the wasteland
Reconstitute the living soil, either in the two parks/nursery planned, or along the Aven river by creating fragments of macadam, allowing nature to take its place

  • Buildings:

Thinking of evolutive buildings, able to adapt to the needs (change of program, extension, ...) by constructive systems, allowing to consider a construction on the long term
Mutualize the needs and services of the inhabitants, to reduce the equipment and the energy expenses of the district (laundry, parking, shared coworking...)

Please give information about the key objectives of your concept/idea in terms of aesthetics and quality of experience beyond functionality and how these would be met.
Please highlight how the concept/idea can be exemplary in this context

The experience and quality of this new space is based on the intrinsic qualities of the site and local resources. In particular, we propose to:
 Offer to the inhabitants this piece of town, by opening it to the public, and thanks to the creation of a promenade along the Aven, while reconnecting it with the existing city center

  •  Redefining the development of the city entrance to requalify it, make it accessible to pedestrians, plant it and green it
  •  Open views on the Aven and the Bois d'Amour thanks to "beats" perpendicular to the Aven, which offer porosities in the district
  • Be inspired by the local architecture, the existing buildings on site, the characteristic striped fabric along the Aven
  • To take up the local construction methods (stone, wood, ...) to fit in with the aesthetics of Pont-Aven.
  •  Pay specific attention to the views from the housing and the different programs and public spaces towards the surrounding nature: Aven, Sainte-Marguerite hill, Bois d'Amour
Please give information about the key objectives of your concept/idea in terms of inclusion (equal opportunities, public participation, citizen engagement, co-design, universal design, accessibility, affordability, etc.) and how these would be met.
Please highlight how the concept/idea can be exemplary in this context

Our project proposes to compose with the Pontavénistes a "workshop-district" which takes advantage of its situation at the entrance of the city to test and adopt a temporality and a more organic urban space based on the decompartmentalization, the mutualization, the modularity and the reversibility of the places and the uses. Then, if it works, to spread them over the territory of Aven.

We proposed a first gathering of the resources, temporal or material, which the territory has, associated with an adapted and located toolbox. From there, we chose to illustrate one possibility, among others, of development of the site in space and in time. Inspired by the new project processes, we proposed, for example, to keep one of the halls to act as a project house and to host the architect-urban planners' offices from the feasibility study "in acts" to the construction site, as well as the times of co-construction between inhabitants. Just as the interstices of space are reappropriated for the benefit of activities of collective interest, the interstices of time allow us to invent the economic and legal alternatives that will ensure the operationality of the project. For us, the essential thing is not to impose a locked programming, a strict division or a precise phasing: we wished to sketch out tracks, to awaken curiosities, and to give the desire, to collectively "remix" the Belle Angèle.

More specifically, this translates into:

  • Project house/interpretation center: involvement of the inhabitants in the project process, exhibition on local resources and know-how, place of memory of the former industrial activities and witness site of the transformation of the Belle Angèle
  • A program addressed to the inhabitants, to the locals: adapted housing (small and medium-sized areas), seasonal rentals, research and training center in connection with nearby universities and companies
  • A space open to all from the beginning of the process to initiate the appropriation of the site
Please explain how these three dimensions would be combined in your concept/idea.
Please highlight how this approach can be exemplary

The three hectares of  Belle Angèle, to the edge of the river and in the hollow of the hillside, are ideally situated to welcome this rhythmic cacophony, to untangle it, amplify it, modulate it, and make it echo throughout the territory. We consider city entrance like the place where rhythms of living beings, human and non-human, are synchronised with natural cycles (water, soil, climate, etc.). Using the potential of the industrial wasteland and the Aven watershed, we imagine situated tools for the activation, programming, fabrication and collective construction of a common project. It’s about composing, with the Pontavénistes, at their city gate, a workshop-district to test and adopt a more organic temporality and urban space based on decompartmentalisation, mutualisation, modularity and reversibility of places and uses. Then spread them over the whole Aven’s territory. We propose an initial collection of resources, temporal and material, available in the area, an adapted toolbox  as well as the illustration of one possibility, among others, for the development of the site in space and time.

Please highlight the innovative character of the concept/idea as compared to mainstream practices in the field of the concept/idea.
  • The time

Taking the time to operate the project, to open it to the public, to think about it collectively, to think about the successive phases of evolution, of life of the building, of the public space and of its components (materials and principles of construction, plants, soil, fauna, inhabitants): clearing of the site, servicing, co-construction, first delivery of the building or the space, time of use, transformation/evolution, second delivery, time of use, ..., recycling of the building materials at the end of its life, ...
It is also a question of thinking about the seasonal nature of the site, seeing its daily and weekly cycles in order to adapt needs, to share them, to live differently in this district according to the hour, the day and the month of the year. 

  • Leave an anthropocentric vision to synchronize our lifestyles with the fauna, flora and natural cycles

To take into account the existing ecosystems, to protect and strengthen them, to measure the impact of man on nature and to reduce it as much as possible, to think of ways to cohabit in harmony with the fauna and flora...

  • Co-constructing the project in situ

From the co-construction with inhabitants and locals in the project house, to the research of constructive modes with the research center, through the scale 1 experimentation on site. Using local materials (metal trusses, macadam, ...), and nearby resources to limit the impact of the construction and participate in the local economic and social activity.

Please detail the general plans that you have for the further development, promotion and/or implementation of your concept/idea.

Our project having been winner of the 16th session of the Europan competition on the site of Pont-Aven, we are led to think from now on its implementation, jointly with the other winners, the city, the inhabitants, as well as the fauna and the flora present on the spot. This process has started after the award ceremony, where we met the mayor of Pont-Aven and the main associations. The Etablissement Public Foncier de Bretagne being the carrier of the project, and the latter having received subventions from the French State ("Front Friche"...), the project will start a pre-operational phase and then quickly become operational. The next 6 months will be devoted to workshops on various themes (rehabilitation of existing halls, recycling of dismantled materials, development of the flora on site, opening to the public, programming, project economics, ...). Following these 6 months, the first works of development will begin to open the site to the public, and to create the site house which will allow exchanges with the residents and any other interested person. The studies that will be carried out in parallel will have to specify the way in which the phasing will allow for a rapid change in the image of this industrial wasteland, while taking the time to carry out the exchanges, reflections, research and experimentation necessary to lead to an inclusive, virtuous and sustainable project. 

Imagine that your idea/concept is awarded in the New European Bauhaus Prizes 2022. What kind of initiatives would you take throughout the following year (June 2022- June 2023)

If our project is awarded by the new European prizes of Bauhaus 2022, it will allow us to finance a certain number of initiatives to implement the project:

  • to carry out permanent visits on site to be closer to the inhabitants, and to refine our perception of the site according to the seasons
  • to look for partnerships on the themes of innovation in urban, landscape and architectural planning, or even to launch calls for experimentation/AMI to accompany us on these subjects
  • all 4 employees in different architectural, urban planning and landscape firms, this would also allow us to pursue this experience under a common structure.
III. UPLOAD PICTURES
IV. VALIDATION
By ticking this box, you declare that you are not in in one or more of the exclusion situations foreseen under Article 136 of the Financial Regulation.
Yes
By ticking this box, you declare that all the information provided in this form is factually correct, that you assume sole liability in the event of a claim relating to the activities carried out in the framework of the contest, that the proposed concept/idea has not been proposed for the New European Bauhaus Prizes 2022 in any other category or strand and that it has not been subject to any type of investigation, which could lead to a financial correction because of irregularities or fraud.
Yes
By submitting your application, you guarantee that you are the author or have the rights to proceed with the application and to authorise the use of the project, concept, idea, and that you have obtained any necessary consents, licenses or assignments from third parties and included copyright notices when necessary.
Yes
By submitting your application, you understand that all the applications that meet the eligibility requirements will be shared for the purposes of the selection processes, and notably published on the secured platform https://prizes.new-european-bauhaus.eu/ and for the purposes of the promotion of these on the New European Bauhaus website and/or other European Commission communication channels. In this sense, the applications would be widely available. Applicants should ensure that they present their ideas, concepts, projects, in such a way that they could be shared without giving rise to intellectual property related concerns. If your submission is selected as one of the finalists, it will additionally be shared for the purpose of the public vote that will take place. The European Union is granted a licence to use and share your application with the general public and the official external experts for the purposes of the selection process, including the voting. The European Union has the right to use the images and visual materials and the description provided in the application for communication purposes related to the contest and beyond. Rights granted comprise the right to store, reproduce, display, publish and communicate or distribute copies in electronic or digital format, including, but not only, through the internet. Unless you have disclosed your name, the European Commission has no obligation to share your name when using or disseminating your contribution to the public. The European Union cannot be held responsible in case any submitted idea, project, concept is found to infringe third parties rights. The European Union shall be neither responsible for the use that third parties may do of the applications or related content.
Yes

Attention

In order to submit your project, please make sure you have filled in all the mandatory fields marked with *, in both the “Basic information” and “Description of the project” tabs.

Attention

The country you have selected is not a Member State of the EU.

Please select the country your project was either implemented in the EU for strand A in or is being developed or intended to be implemented in the EU for strand B.